CLIENT
Moscow Federal Enterprise ‘Road and Bridge Construction Department’
DESIGN STAGE
2022 — 2023
CONSTRUCTION STAGE
2024 — 2027
SCOPE OF WORK
Project Documentation Stage:
- the entire cycle of engineering survey
- hydrological calculation
- air dynamic testing
- full range of design work on main structures with proper calculations
- traffic management design
- reconstruction of utilities
- design of outdoor illumination with architectural lighting, power supply, water
- drainage and navigation lights
- design of structures included in the infrastructure of a linear facility
- construction organization design
- environment safety design
- fire safety design
- structural monitoring for the period of construction as well as per period of site service
- maintenance design for the period of service
- estimate documentation design
TECHNICAL FEATURES
- bridge schema: 183.5+47.9 m
- length of the bridge from abutments – 250.22 m
- pedestrian lane width – 3 m
- bicycle lane width – 1.5 m
- lanes quantity – 4 pcs
- bridge clearance – 10.5х80 m
BRIDGE OVER THE MOSCOW RIVER NEAR NOVOZAVODSKAYA STREET, MOSCOW CITY
Our cable stayed bridge is being conceived over the Moscow River near Novozavodskaya Street. The above construction is considered as a part of the of transportation infrastructure development of the Mnevnikovskaya Bay territory adjacent to the Northwestern Expressway including the access roads, with reconstruction of existed utility network (Stage I).
New bridge crossing is being designed in accordance with architect conception of the Moscow City. Cable stayed system is being presented via sail shape steel structure.
New bridge crossing is being designed in accordance with architect conception of the Moscow City. Cable stayed system is being presented via sail shape steel structure.
SIMILAR OBJECTS