CLIENT
Primorskiy Kray Road Department
GENERAL CONTRACTOR
TMK Ltd
DESIGN STAGE
‘Design Documentation’ Stage: 2006 – 2008
‘Work Documentation’ Stage: 2008 – 2010
‘Work Documentation’ Stage: 2008 – 2010
CONSTRUCTION STAGE
2008 – 2012
SCOPE OF WORK
Project Documentation Stage:
Work Documentation Stage:
- fulfillment of design works as a subcontractor;
- bridge construction design;
- passing of Federal Expertise.
Work Documentation Stage:
- general design;
- total main structures design;
- SAC&D and MS development;
- financial estimates;
- technical supervision.
STRUCTURES COMPOSED OF ROUTE
OVERPASS BETWEEN THE PASSAGE OF GOGOLYA & NEKRASOVSKAYA STREETS
TUNNEL
NORTHERN APPROACH FLYOVER
CABLE STAYED BRIDGE OVER THE GOLDEN HORN BAY
SOTHERN APPROACH FLYOVER
OVERPASS EXIT ON VSEVOLOD SIBIRTSEVA STREET
OVERPASS EXIT ON KALININA STREET
OVERPASS EXIT FROM KALININA STREET
SEA BERTH OF PAСIFIC NAVY (RECONSTRUCTION)
ROAD UTILITY NETWORK WITHIN BRIDGE CROSSING (RECONSTRUCTION)
- overpass length – 80 m;
- overpass width between railings – 9.4 m;
- area of the overpass – 750 m².
TUNNEL
- tunnel length – 249.2 m;
- width – 21 m;
- tunnel total area — 2,770 m².
NORTHERN APPROACH FLYOVER
- material — composite RC;
- total length – 220 m;
- width within barriers – 22.2 m;
- total area – 4,890 m².
CABLE STAYED BRIDGE OVER THE GOLDEN HORN BAY
- bridge schema: 45 + 100 + 2х90 + 737 + 2х90 + 100 + 45 m;
- main span – steel 737 m;
- anchor span – prestressed cast in-situ concrete;
- total length — 1,387 m;
- pylons height – 227 m;
- main span – 737 m;
- underwater clearance – 60 m;
- girder width between barriers – 29.4 m;
- girder height – 3.5 m;
- weight of stays – 1,845 t;
- overpass total area – 43,030 m².
SOTHERN APPROACH FLYOVER
- material — composite RC;
- total length – 123 m;
- width within barriers – 21.4 m;
- flyover total area – 2,620 m².
OVERPASS EXIT ON VSEVOLOD SIBIRTSEVA STREET
- material – composite RC;
- total length –135 m;
- width within barriers – 9.4 m;
- total area – 1,270 m².
OVERPASS EXIT ON KALININA STREET
- material — composite RC;
- total length — 135 m;
- width within barriers – 9.4 m;
- total area – 1,270 m².
OVERPASS EXIT FROM KALININA STREET
- material – composite prestressed RC;
- total length — 135 m;
- width within barriers – 9.4 m;
- total area – 1,440 m2;
SEA BERTH OF PAСIFIC NAVY (RECONSTRUCTION)
- total area – 5,400 m²;
ROAD UTILITY NETWORK WITHIN BRIDGE CROSSING (RECONSTRUCTION)
- area of carriageway – 76,300 m²;
- landscaping of adjacent areas — 60,700 m².