CLIENT
Road Administration of Primorskiy Kray
Rosavtodor, Mostovik
Rosavtodor, Mostovik
GENERAL CONTRACTOR
JSC USK Most
DESIGN STAGE
2008 – 2012
CONSTRUCTION STAGE
2009 – 2012
SCOPE OF WORK
- design of project stage;
- design of SAC&D, main structures;
- aerodynamic tests;
- control of technical decisious;
- verification analysis.
TECHNICAL FEATURES
- bridge diagram: 60+72+3х84+1104+3х84+72+60 m;
- total bridge length — 1, 885.53 m;
- total length with approaches — 3,100 m;
- main span — 1,104 m;
- deck width — 29.5 m;
- carriageway width — 23.8 m;
- number of lanes — 4 (2 per one way);
- clearance — 70 m;
- number of pylons — 2;
- pylon’s height — 320.9 m;
- number of stays — 168 pcs;
- longest stay cable — 578.08 m;
- shortest stay cable — 181.32 m.
CABLE-STAYED BRIDGE RUSSKIY, VLADIVOSTOK
Cable-stayed bridge on Russkiy island, Vladivostok. One of the world biggest cable-stayed crossing of 1,104 m with the highest pylons and longest stay cables ever build currently.