CLIENT
BaltNedvizhService
CONCESSIONER
BaltNedvizhService
COINCIDENT
Saint Petersburg
GENERAL CONTRACTOR
ABZ Dorstroy
DESIGN STAGE
2021
CONSTRUCTION STAGE
2024
SCOPE OF WORK
- design documentation of territory planning;
- stage of DD;
- stage of WD;
- general design.
SIMILAR OBJECTS
TRAM NETWORK ALONG THE ROUTE KUPCHINO-SHUSHARY–SLAVIANKA, ST. PETERSBURG
New tram network is located within Frunzensky, Moskovsky and Pushkinsky Districts of the city and runs from the metro Kupchino up to Slavyanka District.
Two stages of construction are being designated:
Stage 1 - design and construction of the tram network from the old tram route of the Balkanskaya Ploshchad station up to Novgorodsky Prospect including the tram network of Starorussky Prospect with the Tram Depot with access roads;
Stage 2 - design and construction towards the new tram network to the residential neighborhood Slavyanka. Within the section of the route cross the tracks of the Oktyabrskaya Railway, the Moscow Highway and the Vitebskiy Prospect, then through the KAD Ring Road to the Turnpike Moscow - SaintPetersburg. The length of the tram tracks is considered about 21 kilometers.
Two stages of construction are being designated:
Stage 1 - design and construction of the tram network from the old tram route of the Balkanskaya Ploshchad station up to Novgorodsky Prospect including the tram network of Starorussky Prospect with the Tram Depot with access roads;
Stage 2 - design and construction towards the new tram network to the residential neighborhood Slavyanka. Within the section of the route cross the tracks of the Oktyabrskaya Railway, the Moscow Highway and the Vitebskiy Prospect, then through the KAD Ring Road to the Turnpike Moscow - SaintPetersburg. The length of the tram tracks is considered about 21 kilometers.