CLIENT
Department of construction in Ahkhabad City
DESIGN STAGE
‘Design Documentation’ Stage 2009 – 2010
‘Work Documentation’ Stage 2010
‘Work Documentation’ Stage 2010
CONSTRUCTION STAGE
2009 – 2012
SCOPE OF WORK
- engineering survey — geodesic plus hydro-geological (control of the survey as a general designer)
‘Design Documentation’ Stage
- General Design
- passing of state expertise
‘Work documentation’ Stage
- development of site architectural decisions
- design of engineering structures
- design of roads and traffic interchanges
- street illumination with electric power supply design
- landscaping design
- SAC&D plus construction technology development
- field supervision
- technical supervision
- passing of state expertise
SIMILAR OBJECTS
HIGHWAYS, BRIDGES, INTERCHANGES AND FLYOVERS IN THE CITY OF ASHKHABAT AND AKHAL VELAYAT
Construction of motorway ‘East-West’ from the intersection of Ring Road with ‘Ashkhabad-Mary’ motorway up to highway ‘Ashkhabad — Turkmenbashi’ with local route to Geokdepe village near Ashkhabad. Traffic interchange at the intersection of South Ring Road up to Turkmenbashi avenue.
FACILITIES AS APART OF THE ROUTE
FACILITIES AS APART OF THE ROUTE
- Seven traffic interchanges at the intersections of the existing highways with average area of 1 km² each:
- Junction at the intersection of Ring Road with the Highway ‘Ashkhabad—Mary’ and railway tracks near the settlement of Gyami
- Traffic interchange in the area of «PK 160» per connection with bridge structure
- Transport junction at the intersection of Tretya Pyatiletka Street with Kulieva Street together with the traffic interchange with a new bridge crossing constructed under separate contract
- Traffic interchange at the intersection of Andaliba Street with Kulieva Street plus connection of the traffic interchange with a new bridge crossing constructed at the site of in-service bridge
- Traffic junction at the intersection of Niyazova Street and Kulieva Street with linking of the traffic interchange plus the new bridge crossing constructed at the site of the old one
- Traffic interchange at the intersection of the motorway ‘Ashkhabad – Turkmenbashi’ with the highway toward Geokdepe and railway tracks Ashkhabad – Turkmenbashi
- Junction at the intersection of the Ring Road Southern part with Turkmenbashi Prospect
- Two lots of Ring Road 10 km long
- Three bridge crossings over the Karakum River with approaches and junctions