CLIENT
Krokus, CJSC
GENERAL CONTRACTOR
Kurganstalmost, CJSC
DESIGN STAGE
2013 — 2014
CONSTRUCTION STAGE
May 2013 — November 2014
TECHNICAL FEATURES
- scheme: 27 + 25.2 + 3.6 + 46.3 + 173.4 + 46.3 + 1.4 + 27 + 27
- total bridge length – 377.2 m
- full length (including retaining walls) – 422.55 m
- width – 6.756 m
- area – 2,548.36 m²
- length of retaining walls – 45.35 m
- main walkway width – 5.0 m
- pedestrian lane longitudinal inclination – 5%
- footbridge lane transversal inclination – 20%
- underbridge clearance – 14.5 m
- total weight of steel (superstructures, pylons, cable stays) – 1,221.3 t
- pylon height – 41 m
SCOPE OF WORK
- formulation of the concept of pedestrian crossing
- development of architectural solutions
- design of main structures
- design of construction technology
- design of SAS&D