CLIENT
Administration of Ufa City
DESIGN STAGE
2012
CONSTRUCTION STAGE
2013
TECHNICAL FEATURES
- bridge schema: 2х40+25+27 m
- total bridge length – 240 m
- entire length – 131 m
- width of deck – 3 m
- deck clearance – 7 m
- pavement longitudinal inclination – 10%
- total area of pedestrian crossing – 691 m²
- pylon height – 30 m
- total steel weight – 86 tons
- entire weight of RC – 980 m³
- number of staircases – 5 pcs
- elevators – 4 pcs
SCOPE OF WORK
- general design
- development of architectural solutions
- main structure design
- development of construction technology
- issue of SAC&D
SIMILAR OBJECTS
FOOTBRIDGE OF ORIGINAL DESIGN ON MENDELEEVA STREET AT A PUBLIC TRANSPORT STOP TRAMPLIN
Project proposal
Remarkable footbridge crossing near Mendeleev Street in Ufa City on but stop Tramplin in Oktyabrskiy District of the City of Ufa. Our landmark was designed as a single pylon composite reinforced concrete cable stayed structure.