CLIENT
State budgetary institution of the Kaliningrad region "Road management department of the Kaliningrad region"
GENERAL CONTRACTOR
JSC "USK Most"
DESIGN STAGE
2014 — 2015
CONSTRUCTION STAGE
2016 — 2017
TECHNICAL FEATURES
Construction of flyover should be carried out in two stages
Facilities, stage 1:
From Moskovsky Prospect to the Novaya Pregolya River, length of 2.46 km
Second stage of construction
From Artilleriyskaya St. to the traffic interchange with Moskovsky Prospect, length of 3.01 km
Facilities, stage 1:
From Moskovsky Prospect to the Novaya Pregolya River, length of 2.46 km
- Flyover of cast in-situ RC at the intersection of «Vostochnaya» Route with Moskovsky Prospect
- Retaining walls on the approaches to the Bridge over the Novaya Pregolya River
- Exit from the Bridge over the Novaya Pregolya River
- Traffic Interchange on the Oktyabrsky Island
Second stage of construction
From Artilleriyskaya St. to the traffic interchange with Moskovsky Prospect, length of 3.01 km
- Two way traffic lanes per 3.5-4.0 m
- Two traffic circles at the same level
- Width of sidewalks – 3 m
- Width of road divider – 1 m
SCOPE OF WORK
Stage «Design»
- Design of basic structures: piers, superstructures, retaining walls
- Road approaches and junctions to the existing road system design
- Design of the entire SAC&D
- Development of spans launching technology
- Glavgosekspertiza (General Board of State Expert Review)