CLIENT
Directorate of Transport Construction Committee for Improvement
DESIGN STAGE
2006 — 2008
TECHNICAL FEATURES
First stage
Main route overpass in line with Krasnoputilovskaya Street
Second stage
Right-turn ramp overpass from Krasnoputilovskaya Street to Chervonnogo Kazachestva Street.
Flyovers of the left-bank exit from Chervonnogo Kazachestva Street to Krasnoputilovskaya Street
Main route overpass in line with Krasnoputilovskaya Street
- slab-ribbed span structures;
- scheme: (5×16.0) + (18.0 + 30.0 + 40.0 + 30.0 + 2×21.5 + 4×30) + (11 + 16.0) + (30.0 + 36.0 + 24.0 + 2×29.0) m;
- total length – 685 m.
Second stage
Right-turn ramp overpass from Krasnoputilovskaya Street to Chervonnogo Kazachestva Street.
- continuous steel-reinforced concrete span structures;
- scheme: (2x2.0 + 42.0 + 63.0 + 32.3 + 30.0 + 41.85) + (41.85 + 4x42.0 + 63.0 + 41.8) + (41.8 + 3x42.0 + 39.0 + 22.8);
- total length — 800.53 m.
Flyovers of the left-bank exit from Chervonnogo Kazachestva Street to Krasnoputilovskaya Street
- scheme: (3×42.0 + 63.0 + 42.0 + 41.8) + (41.8 + 3×42.0 + 63.0 + 2×42.0) m;
- total length – 594.8 m.
SCOPE OF WORK
- investment justification
Stage "Project documentation"
- general design;
- definition of the concept of the transport interchange;
- design of overpass structures;
- design of construction technology;
- design of construction organization;
- passing the Main State Expertise.