Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
SC  Lengiprotrans
GENERAL CONTRACTOR
Pylon Ltd
DESIGN STAGE
DD development: 2013
WD development: 2015 — 2016
CONSTRUCTION STAGE
2015 — 2016
TECHNICAL FEATURES
  • viaduct schema — 27.6 + 35.1 + 126.0 + 35.1 + 27.6m;
  • length of the viaduct — 252.2m;
  • carriageway schema — 2(13.25+3.0)m;
  • deck steel weight — 2,220 t;
  • deck RC slab — 3,210m³;
  • total RC weight — 8,317m³.
SCOPE OF WORK
Stage WD:
  • main structure design;
  • method statement development;
  • SAC&D design.
SIMILAR OBJECTS
SOUTH BRIDGE OVER THE DAUGAVA RIVER IN RIGA, LATVIA
FLYOVER ON DUNAYSKY PROSPECT, ST.PETERSBURG, RF
The structure is located in Moskovsky District of St. Petersburg City at the intersection of the city's most important transportation interchange - Pulkovo Highway and Dunaysky Prospect. Construction of the junction of several levels ensured comfort and unhindered traffic links for motorists within inter-district and intra-city areas.  The above construction did improve the environmental status in the area back in 2017.
Logo
Dynamic Heading