CLIENT & GENERAL CONTRACTOR
JSC WHSD
CONTRACTOR
ICA Astaldi Ictas
OWNER
Northern Capital Highways, Ltd
DESIGN STAGE
2013 — 2014
CONSTRUCTION STAGE
2016 - present
TECHNICAL FEATURES
- Total highway length – 12 km
- Designated speed – 120 km/h
- Number of lanes – 8
- One way carriageway length – 2х50+2х3.75
- Emergency lane width – 2.0 m
- Dividing lane width – 5.0m (including emergency lane per 1 m)
- Road pavement – asphalt-concrete
- Turn radius – 500 m
- Minimum convex turn radius – 8,500 m, concave part – 5,000 m
- Maximum inclination – 36 %
SCOPE OF WORK
- Design documentation per Cable Stayed Bridge over the Petrovsky Channel
- Work documentation per Cable Stayed Bridge over the Petrovsky Channel
- SAC&D
- MS development and issue
SIMILAR OBJECTS
CONSTRUCTION OF MOTORWAY WESTERN HIGH SPEED DIAMETER, SAINT-PETERSBURG
Section from Traffic Interchange in the sector of the Ekateringofka River to Traffic Interchange in the area of Shkipersky Protok Street (Stage V of construction) and in the district of Shkipersky Protok Street up to the Right Bank of the Bolshaya Nevka River (Stage V of construction).
Site location – Primorsky, Vasileostrovsky and Petrogradsky city districts.
Site location – Primorsky, Vasileostrovsky and Petrogradsky city districts.