Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT & GENERAL CONTRACTOR
JSC WHSD
CONTRACTOR
ICA Astaldi Ictas
OWNER
Northern Capital Highways, Ltd
DESIGN STAGE
2013 — 2014
CONSTRUCTION STAGE
2016 - present
TECHNICAL FEATURES
  • Total highway length – 12 km
  • Designated speed – 120 km/h
  • Number of lanes – 8
  • One way carriageway length – 2х50+2х3.75
  • Emergency lane width – 2.0 m
  • Dividing lane width – 5.0m (including emergency lane per 1 m)
  • Road pavement – asphalt-concrete
  • Turn radius – 500 m
  • Minimum convex turn radius – 8,500 m, concave part – 5,000 m
  • Maximum inclination – 36 %
SCOPE OF WORK
  • Design documentation per Cable Stayed Bridge over the Petrovsky Channel
  • Work documentation per Cable Stayed Bridge over the Petrovsky Channel
  • SAC&D
  • MS development and issue
SIMILAR OBJECTS
CENTRAL RING ROAD MOTORWAY, MOSCOW REGION
CONSTRUCTION OF MOTORWAY WESTERN HIGH SPEED DIAMETER, SAINT-PETERSBURG
Section from Traffic Interchange in the sector of the Ekateringofka River to Traffic Interchange in the area of Shkipersky Protok Street (Stage V of construction) and in the district of Shkipersky Protok Street up to the Right Bank of the Bolshaya Nevka River (Stage V of construction).
Site location – Primorsky, Vasileostrovsky and Petrogradsky city districts.

Logo
Dynamic Heading