Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Department of transportation of Primorskiy Kray
DESIGN STAGE
2008
CONSTRUCTION STAGE
2009
TECHNICAL FEATURES
  • tunnel length L=249.5 m;
  • number of lanes 2 х 3.50 m;
  • emergency lanes – per 1.0 m in each direction;
  • pedestrian lane — 0.75 m;
  • tunnel dimension — 5.4 m;
  • area of tunnel — 4,490.5 m2;
  • volume of RC – 1,7193.2 m3;
  • type of rebar — A-I 72.9 tons ; A-III 1,247.7 tons.
SCOPE OF WORK
Stage DD:
  • design development;
  • work technology design;
  • estimation calculation.
Stage WD:
  • general design;
  • estimation calculation.
SIMILAR OBJECTS
TRANSPORTATION TUNNEL TO KANONERSKIY ISLAND UNDER THE FAIRWAY IN SAINT PETERSBURG, RUSSIA
TRANSPORTATION TUNNEL TO KANONERSKIY ISLAND UNDER THE FAIRWAY IN SAINT PETERSBURG, RUSSIA
MOTORWAY TUNNEL, VLADIVOSTOK CITY
Motorway tunnel is a part of the bridge crossing over the Golden Horn Bay in Vladivostok on the way connecting the federal road M-60 «Ussuri — Khabarovsk-Vladivostok” with Russki Island”.
Logo
Dynamic Heading