Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Department of transportation of Primorskiy Kray
DESIGN STAGE
2008
CONSTRUCTION STAGE
2009
TECHNICAL FEATURES
  • tunnel length L=249.5 m;
  • number of lanes 2 х 3.50 m;
  • emergency lanes – per 1.0 m in each direction;
  • pedestrian lane — 0.75 m;
  • tunnel dimension — 5.4 m;
  • area of tunnel — 4,490.5 m2;
  • volume of RC – 1,7193.2 m3;
  • type of rebar — A-I 72.9 tons ; A-III 1,247.7 tons.
SCOPE OF WORK
Stage DD:
  • design development;
  • work technology design;
  • estimation calculation.
Stage WD:
  • general design;
  • estimation calculation.
SIMILAR OBJECTS
TRANSPORTATION TUNNEL TO KANONERSKIY ISLAND UNDER THE FAIRWAY IN SAINT PETERSBURG, RUSSIA
MOTORWAY TUNNEL, VLADIVOSTOK CITY
Motorway tunnel is a part of the bridge crossing over the Golden Horn Bay in Vladivostok on the way connecting the federal road M-60 «Ussuri — Khabarovsk-Vladivostok” with Russki Island”.
Logo
Dynamic Heading