CLIENT
Department of Capital Construction of the city of Cherepovets
GENERAL CONTRACTOR
JSC Mostostroy 6; Mostootryad 61
DESIGN STAGE
2007 — 2009
CONSTRUCTION STAGE
2007 — 2011
SCOPE OF WORK
Stage ‘Project documentation & Stage ‘Work documentation’:
- designing of structures of bridge crossing
- development of technologies of reconstruction of the old bridge without interruption of traffic flow and separation of utilities
- development of SAC&D
- development of Construction MS
- reconstruction of adjacent embankment
- field supervision
- undergoing of main state expert review
SIMILAR OBJECTS
BRIDGE ACROSS THE YAGORBA RIVER IN THE CITY OF CHEREPOVETS
Reconstruction of the existing bridge. Bridge across the Yagorba River connects the Zarechinsky District with the city center.
OLD BRIDGE
NEW BRIDGE
OLD BRIDGE
- one traffic lane for motor-vehicle transport
- tram tracks at one level with asphalt covering carriageway total width 13.5 m
- navigable span 20 m
NEW BRIDGE
- four traffic lanes in each direction
- elevated tram tracks allocated out of the total traffic flow
- carriageway width 38.5 m
- wide sidewalks
- navigable span 40 m
- underbridge clearance 6.2 m