CLIENT
Department of Architecture and Construction of Administration of the town of Tver
GENERAL DESIGNER
SC Institute Giprostroymost — Saint Petersburg
DESIGN STAGE
‘Project documentation’ Stage: 2013 — 2020
‘Work documentation’ Stage: 2020
‘Work documentation’ Stage: 2020
CONSTRUCTION STAGE
2022 — 2025
TECHNICAL FEATURES
- base line – 3003.09 m;
- number of traffic lines – 4.
Traffic interchange with the St.Petersburg highway:
- St.Petersburg highway — 693.65 m;
- 4 traffic lanes;
- interchange exit 1 – 340.10 m, 3 traffic lanes;
- interchange exit 2 – 306.7 m, 3 traffic lanes;
- interchange exit 3 – 94.2 m, 1 traffic lane.
Traffic interchange at the Komsomolskaya Square:
- Kalinina prospect — Lenina prospect – 282.50 m;
- circlular movement – 453.33 m.
Number of traffic lanes:
- Kalinina prospect – 8;
- Lenina prospect – 4;
- circlular movement – 3.
FACILITIES AS A PART OF THE BRIDGE CROSSING
Highway bridge over the Volga River
Highway overpass across railroad tracks on the Peterburgskoe highway (Gorbaty Bridge)
Railway viaduct over Kalinina Prospect, Northern Approach Viaduct
girder steel simple span of special design with the roadway below
- steel continuous superstructure;
- abutments and intermediate piers made of reinforced concrete on a piled foundation;
- length – 349.57 m;
- schema – 99+126+99 m;
- width between the railings – 38.05 m;
- area – 13,301 m².
Highway overpass across railroad tracks on the Peterburgskoe highway (Gorbaty Bridge)
- composite reinforced concrete continuous spans of customized design;
- length – 158.47 m;
- schema – 40+47+40 m;
- width between the railings – 26.1 m;
- area – 4,136 m².
Railway viaduct over Kalinina Prospect, Northern Approach Viaduct
girder steel simple span of special design with the roadway below
- length – 70.9 m;
- schema – 27+27 m;
- number of tracks – 2;
- width between the railings – 12.5 m;
- area – 886.25 m².
SCOPE OF WORK
‘Design documentation’ stage
‘Working documentation’ stage
- general design
- undergoing of main state expert review
‘Working documentation’ stage
- general design
SIMILAR OBJECTS
BRIDGE OVER THE VOLGA RIVER IN THE CITY OF TVER (WESTERN BRIDGE)
The bridge is located in a densely populated area of the city of Tver and includes a highway from the St. Petersburg highway to Kalinina prospect (the area of Komsomolskaya Square — Tmaka River) passing in parallel to the railway bed, with reconstruction of the highway overcrossing over the railway tracks on the St. Petersburg highway (Gorbaty Bridge), construction of the bridge over the Volga River (Western bridge), reconstruction of the railway overcrossing over Kalinina prospect. Road category — through street of citywide importance with controlled traffic.