CLIENT
Department of road transportation of Primorskiy Kray
GENERAL CONTRACTOR
OOO Transstroymehanizasiya
GENERAL DESIGNER
OOO Transproekt
DESIGN STAGE
2020
CONSTRUCTION STAGE
2021
TECHNICAL FEATURES
- Road type - IВ;
- Lanes quantity – 4 (per 2 lanes of each direction);
- Designated speed – 120 km/h;
- Roadbed width – 28.5 m;
- Lane width – 3.75 m;
- Roadway width – 7.5 m;
- Emergency lane – 3.0 m;
- Designated loads - А14; Н14.
Technical features of the bridge crossing:
- Bridge schema – 2(G-11.5) m;
- Two technical approaches – 0.75 m;
- Angle of intersection with the river - 90°;
- Designated loads – А14 & Н14 based on SP35.13330.2011;
- Bridge schema 4х(3х42) m;
- Flyover of 33 m based on the Project 3.503.1-81.
SCOPE OF WORK
Overpasses were developed by the Khabarovsk branch of JSC GiprodorNII back in 2013. Design documentation received a positive conclusion from State Expert Board. While documentation correction procedure, the designers of SC Institute Giprostroymost – Saint Petersburg made proposals for the most cost effective structure optimization.
- engineering survey;
- adjustment of engineering survey;
- development of DD and WD;
- technical supervision.
SIMILAR OBJECTS
MOTORWAY ROAD WITH BRIDGE OVER THE ARTEMOVKA RIVER
Motorway Vladivostok – Nakhodka – Port Vostochniy together with Lot 18 + 500 km plus 40+800 km in Primorsky Krai plus the bridge over the Artemovka River at PK 22+52.95 with the PK 30+93.