CLIENT 
  Department of Road Section of Primorskiy Kray 
  GENERAL CONTRACTOR 
  ZAO ‘TMK’ 
  DESIGN STAGE 
  2010 – 2011
 
  CONSTRUCTION STAGE 
  2010 – 2012 
  STRUCTURES COMPOSED OF ROUTE 
   Bridge over the Amurskiy Gulf with main features as follows:
Transportation interchange within Makovskogo Street and flyover
 - bridge total length – 4,380 m
- 16 continuous composite RC girders with each panel per 273.8m long
- bridge schema: 42.4+3х63+42.4 m
- width – 23.88 m
- clearance — 2(Г10)
- sidewalks – 2х1.0 m
- carriageway width – 2 х 7.5m = 2х(2х3.75)m
- dividing lane width – 2.7 m
- technical approaches – 2х0.75 m
Transportation interchange within Makovskogo Street and flyover
- type of transportation interchange – ‘clover’
- flyover schema – 4х24 m
- material– RC girders
- flyover total length – 101.42 m
- clearance — 2(Г-14.25 m)
 SCOPE OF WORK 
   ‘Work Documentation’ Stage
 - general design
- total main structures design
- design of motorway with junction
- underground pedestrian crossings design
- SAC&D, construction technology and MS design
- illumination and power supply arrangement
- sewage facilities completion
- utilities network rearrangement
- heating boilers modification
- technical supervision
- Federal Expertise passing
 SIMILAR OBJECTS 
  LOW-WATER BRIDGE OVER AMURSKY GULF BETWEEN PENINSULA DE-FRIZ AND SET. SEDANKA IN VLADIVOSTOK 
  Highway village Noviy — Peninsula De-Friz -Sedanka – Patrokl Bay with bridge (overpass) De-Friz – Sedanka. City bridge in Vladivostok city connecting Peninsula De-Friz with Sedanka settlement.