Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Department of Road Section of Primorskiy Kray
GENERAL CONTRACTOR
ZAO ‘TMK’
DESIGN STAGE
2010 – 2011
CONSTRUCTION STAGE
2010 – 2012
STRUCTURES COMPOSED OF ROUTE
Bridge over the Amurskiy Gulf with main features as follows:
  • bridge total length – 4,380 m
  • 16 continuous composite RC girders with each panel per 273.8m long
  • bridge schema: 42.4+3х63+42.4 m
  • width – 23.88 m
  • clearance — 2(Г10)
  • sidewalks – 2х1.0 m
  • carriageway width – 2 х 7.5m = 2х(2х3.75)m
  • dividing lane width – 2.7 m
  • technical approaches – 2х0.75 m

Transportation interchange within Makovskogo Street and flyover
  • type of transportation interchange – ‘clover’
  • flyover schema – 4х24 m
  • material– RC girders
  • flyover total length – 101.42 m
  • clearance — 2(Г-14.25 m)
SCOPE OF WORK
‘Work Documentation’ Stage
  • general design
  • total main structures design
  • design of motorway with junction
  • underground pedestrian crossings design
  • SAC&D, construction technology and MS design
  • illumination and power supply arrangement
  • sewage facilities completion
  • utilities network rearrangement
  • heating boilers modification
  • technical supervision
  • Federal Expertise passing
SIMILAR OBJECTS
BRIDGE OVER THE VOLGA RIVER IN THE CITY OF TVER (WESTERN BRIDGE)
LOW-WATER BRIDGE OVER AMURSKY GULF BETWEEN PENINSULA DE-FRIZ AND SET. SEDANKA IN VLADIVOSTOK
Highway village Noviy — Peninsula De-Friz -Sedanka – Patrokl Bay with bridge (overpass) De-Friz – Sedanka. City bridge in Vladivostok city connecting Peninsula De-Friz with Sedanka settlement.
Logo
Dynamic Heading