CONCESSIONAIRE
ООО PКК
GRANTOR
Ministry of Transportation and road infrastructure of Moscow Oblast
GENERAL CONTRACTOR
Construction Company VIS
DESIGN STAGE
2018 – 2019
CONSTRUCTION STAGE
2020 – 2022
SCOPE OF WORK
Project Documentation Stage:
  • general design
  • roadway design
  • main structures design
  • technology and assembling design
  • SAC&D development with construction design
  • cost estimation documentation development
  • participation in State Expertise

Work Documentation Stage:
  • general design
  • roadway design
  • main structures design
  • technology and assembling design
  • SAC&D development with construction design
  • cost estimation documentation development
  • participation in State Expertise
SIMILAR OBJECTS
SOUTH-EASTERN CHORD
MOTORWAY VINOGRADOVO-BOLDINO-TARASOVKA
Turnpike to be designed and constructed within Mitishinskiy and Pushkinskiy municipal districts of Moscow Oblast for the  better service and comfort of motorist to avoid traffic jams on local transportation network plus time saving towards the Highway A104  Moscow – Dmitrov –Dubna and M-8 Holmogory.
Being designed motorway includes engineering transportation structures, earth work, bridges, overpasses, retaining walls, transport interchanges, road junctions, and toll booths with other related objects.
Construction commencement is being arranged from the Highway A-104 Moscow-Dmitrov-Dubna-Povedniki near the village of Afanasovo in the Mytishchi District of the Moscow Oblast.  The end of the roadway is located at the junction with the Lot M-8  Kholmogory  Moscow-Yaroslavl-Vologda-Arkhangelsk.
  • type of construction—new;
  • road class—I-B;
  • construction length—16.1 km;
  • designated speed limit—120 km/h;
  • designated speed limit within rough terrain—100 (60) km /h;
  • lanes quantity per opposite directions—2+2;
  • carriageway width —2х7,5 m;
  • width of road median —5 m;
  • emergency lanes width —3.75-7.50 m; 2.50 m;
  • earth work width—28.5-34.2 m;
  • road pavement type – capital with  asphalt-concrete layer;
  • flyovers and bridges—11 pcs.;
  • transportation interchanges —6 pcs.