CLIENT
Federal Road Administration of Bashkortostan Republic
GENERAL DESIGNER
Federal Enterprise Bashkirdortransproject
DESIGN STAGE
2013
CONSTRUCTION STAGE
2016 - 2019
TECHNICAL FEATURES
- bridge schema 49+2х84+63+42 m;
- intermediate piers height ̶ 20 m;
- two various types of abutments. One, which is being embedded in natural rock soil and the second one, which is being placed on piled foundation of 20 m height;
- lanes quantity – 2 pcs;
- width of two-way pedestrian lane – 1.0 m.
SCOPE OF WORK
- main design solutions development;
- DD development;
- WD development.
SIMILAR OBJECTS
BRIDGE OVER THE UFA RIVER, BASHKORTOSTAN REPUBLIC
Bridge over the Ufa River is being designed on the motorway Birsk-Tastuba-Satka (detour sector near Karaidel Village, Bashkortostan). Seismicity of the construction area is based on Richter scale and has magnitude of 6 points.