Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Federal Road Administration of Bashkortostan Republic
GENERAL DESIGNER
Federal Enterprise Bashkirdortransproject
DESIGN STAGE
2013
CONSTRUCTION STAGE
2016 - 2019
TECHNICAL FEATURES
  • bridge schema 49+2х84+63+42 m;
  • intermediate piers height  ̶  20 m;
  • two various types of abutments. One, which is being embedded in natural rock soil and the second one, which is being placed on piled foundation of 20 m height;
  • lanes quantity – 2 pcs;
  • width of  two-way pedestrian lane – 1.0 m.
SCOPE OF WORK
  • main design solutions development;
  • DD development;
  • WD development.
SIMILAR OBJECTS
LOW-WATER BRIDGE OVER AMURSKY GULF BETWEEN PENINSULA DE-FRIZ AND SET. SEDANKA IN VLADIVOSTOK
BRIDGE OVER THE UFA RIVER, BASHKORTOSTAN REPUBLIC
Bridge over the Ufa River is being designed on the motorway  Birsk-Tastuba-Satka  (detour sector near Karaidel Village, Bashkortostan). Seismicity of the construction area is based on Richter scale and has magnitude of 6 points.
Logo
Dynamic Heading