CLIENT
Authority of UFA City
GENERAL DESIGNER
Institute Giprostroymost — Saint-Petersburg
DESIGN STAGE
2011
CONSTRUCTION STAGE
2012 — 2013
TECHNICAL FEATURES
- transversal schema – 4.35+4.35m
- RC slabs with width of 150mm
- length of tunnel — 37m
- tunnel width dimensions – 0 х 2m
- longitudinal inclination of tunnel — 5%
- tunnel height — 2.5m
- entire length – 68.2m
- approaches for handicaps — 3pcs per 1.5m
- minimum height — 2.5m
SCOPE OF WORK
- general design
- design of WD
- technology of construction design
- SAC&D design
- design of MS
- expertise fulfillment
SIMILAR OBJECTS
UNDERGROUND PEDESTRIAN CROSSING IN
ORDZHONIKIDZEVSKY DISTRICT OF THE CITY OF UFA
ORDZHONIKIDZEVSKY DISTRICT OF THE CITY OF UFA
Monolithic underground pedestrian crossing is located at municipal transport stop “Boulevard Slavy” in Ufa City.