CLIENT
Department of construction in Ashkhabad City
GENERAL CONTRACTOR
ZAO Vozrozhdenie
DESIGN STAGE
Project Documentation Stage 2009 – 2010
Work Documentation Stage 2009 – 2011
Work Documentation Stage 2009 – 2011
CONSTRUCTION STAGE
2010 — 2011
TECHNICAL FEATURES
Flyover
Approaches to viaduct
- continuous composite RC deck structure
- schema — 30×42 m
- total length – 1,300 m
- flyover width between barriers – 36.3 m
- entire area – 47,190 m²
Approaches to viaduct
- approaches total length – 650 m
- carriageway clearance – 28.5 m
- area of approaches – 23,595 m²
SCOPE OF WORK
Project Documentation Stage
Work Documentation Stage
- General Design function fulfillment
Work Documentation Stage
- general design
- total main structures design
- SAC&D design
- technical supervision
- Federal Expertise passing
SIMILAR OBJECTS
MOTORWAY FLYOVERS ON THE HIGHWAY TURKMENBASHI AIRPORT – NATIONAL TOURIST RESORT AVAZA LOT 1
Viaduct of 400 m long within motorway Turkmenbashi Airport – national tourist resort Avaza.
Total structures were designed with consideration for maximum seismic activity of 9 points and more.
Location of the viaduct was conceived for transportation convenience within city districts for the comfort of speedy Turkmenbashi Airport approach as well as to national tourist resort Avaza together with designed two independent lanes of cozy highway toward Turkmenbashi Town with the following basic features:
LOT 2
SITE DESCRPTION
Design and construction of the motorway bridge (flyover) with total length of 1,300 m within Turkmenbashi Airport approach toward national tourist resort Avaza. The above-mentioned viaduct is located within North-West part of speed Turkmenbashi Highway Airport approach completed as a shortcut to national tourist resort Avaza.
Total structures were designed with consideration for maximum seismic activity of 9 points and more.
Location of the viaduct was conceived for transportation convenience within city districts for the comfort of speedy Turkmenbashi Airport approach as well as to national tourist resort Avaza together with designed two independent lanes of cozy highway toward Turkmenbashi Town with the following basic features:
- deck – solid RC structure of customized design
- height of the structure – 1.4 m
- deck schema – 3х32+4х32+4х32 m
- total length – 1,527.84 m
- viaduct length – 400 m
- total length of 11 Exits – 3,800 m
- entire area – 51,780 m²
- total area of 11 Exits – 60,692 m²
- carriageway clearance - Г – 14.25+14.25
- calculated live loads – А-14, НК-100
LOT 2
SITE DESCRPTION
Design and construction of the motorway bridge (flyover) with total length of 1,300 m within Turkmenbashi Airport approach toward national tourist resort Avaza. The above-mentioned viaduct is located within North-West part of speed Turkmenbashi Highway Airport approach completed as a shortcut to national tourist resort Avaza.