CLIENT
Committee for the Development of Transport Infrastructure of St. Petersburg
DESIGN STAGE
2021 - 2022
CONSTRUCTION STAGE
2022 – 2025
TECHNICAL FEATURES
- Motorway road of Class – II;
- Lanes quantity – 4-6 pcs;
- Width of tramway road – 7.50 m;
- Pedestrian lanes are being equipped with bicycle tracks.
SCOPE OF WORK
- Set of engineering survey;
- DD development;
- Economical research.
SIMILAR OBJECTS
TRANSPORTATION ROUTE WITH BOLSHOI SMOLENSKIY BRIDGE, SAINT-PETERSBURG
It is innovative transportation route with bridge over the Neva River near Kolontay Street. The area of future construction site is being considered from Prospect Obuhovskoy Oborony up to Dalnevostochni Avenue.
UNIQUENESS
It is new bascule bridge of Saint-Petersburg after more than forty years period.
- Motorway with a length of 2,34 km;
- 3 two level transportation interchanges;
- Viaduct over the Prospect Obuhovskoy Oborony;
- Viaduct over the Dalnevostochni Avenue;
- Bridge crossing over the Neva River near Kolontay Street.
UNIQUENESS
It is new bascule bridge of Saint-Petersburg after more than forty years period.