CLIENT
AO  Mostostroy - 11
GENERAL CONTRACTOR
SC Mostostroy - 11
DESIGN STAGE
2017
CONSTRUCTION STAGE
2018
TECHNICAL FEATURES
  • bridge— 63+126+2х84 m
  • total length  — 363 m
  • carriageway schema — G-8+2х1.0 m
SCOPE OF WORK
  • SAC&D development with construction design.
  • Technology of deck disassembling

Construction of temporary piers per spans N 1-2, 3-4 and N 4-5 for deck disassembling. Consoles installation for hydraulic jacks on span N2-3. Fixation of additional cross beams. Cutting procedure of previous superstructure. Lowering the cut-off spots onto the sleeper cages. Cutting of the superstructure 2-3 per segments.
SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
BRIDGE RECONSTRUCTION OVER THE TOBOL RIVER, TUMEN OBLAST
Bridge crossing reconstruction within Motorway Р404 Tumen-Тobolsk-Khanti-Мansiysk, Tumen Oblast 123+349 km.