CLIENT
Federal Administration of Motorways of Nizhegorodskaya Oblast
DESIGN STAGE
2021 - 2023
CONSTRUCTION STAGE
2025
SCOPE OF WORK
Stage «Project documentation»:
- general design
- design of basic structures
- design of reconstruction approaches
- development of PIC
- estimated calculation of reconstruction of a section of the highway
- presentation of design and estimate documentation to the Federal State Institution «Glavgosexpertiza of Russia»
- support of expertise
SIMILAR OBJECTS
ALTERNATIVE ROUTE TO GAGARIN AVENUE, NIZHNIY NOVGOROD (STAGE 4)
Gagarin Avenue Backup Street is being constructed as a new highway from Ankundinski Motorway up to Julius Fuchik Street. The above new road should ease that heavy traffic of the only city highway, which is an industrial zone important link of the Soviet and Prioksky Districts and it should connect new neighborhoods (Ankudilovsky Park, Novaya Kuznechikha, Flowers, Novelties) with the city center including Strigino Airport. Being constructed bridge crossing of Gagarin Avenue as a part of Alternative Highway must be that keystone of the comfort for local drivers via the bridge heavy traffic unloading over the Oka River. Our site is located within the mouth of Oka River (4.5 km from Fuchik Street). Five stages of this project are being designed as follows:
Stage 1 – Gagarin Ave Backup Street, Nizhniy Novgorod (Stage 4)
Approaches to the bridge crossing:
Stage 2 – Construction of transportation interchange on the intersection of Motorway N22 Ryazhsk-Kasimov-Murom-Nizhny Novgorod with the Alternative Road of Gagarin Ave. in Prioksky District, Nizhny Novgorod
Artificial structures:
Stage 3 – Reconstruction of motorway along Hero Shnitnikova in Avtozavoskiy Region, Nizniy Novgorod
Stage 4 – Reconstruction of motorway along Hero Shnitnikova in Avtozavoskiy Region, Nizhniy Novgorod
Stage 1 – Gagarin Ave Backup Street, Nizhniy Novgorod (Stage 4)
Approaches to the bridge crossing:
- Road category – Main Street of regulated traffic
- Highway length – 1.2 km
- Lanes number – 4 pcs
- Designated speed – 80 km/h
- Lane width – 3.5-3.75 m
- Pedestrian lane width – 2.0 m
- Construction period – 46 months
Stage 2 – Construction of transportation interchange on the intersection of Motorway N22 Ryazhsk-Kasimov-Murom-Nizhny Novgorod with the Alternative Road of Gagarin Ave. in Prioksky District, Nizhny Novgorod
- Road category – Main Street of regulated traffic
- Construction length – 0.994 km
- Designated speed – 80 km/h
- Lanes quantity – 4 pcs
- Construction period – 22 months
Artificial structures:
- Flyover
- Lengths – 102.3 m
- Structure dimensions – 2(G-13.25)
- Designated loads – А14, Н14
Stage 3 – Reconstruction of motorway along Hero Shnitnikova in Avtozavoskiy Region, Nizniy Novgorod
- Type of construction – reconstruction
- Road category – Main Street of regulated traffic
- Construction length – 1,832 km
- Designated speed – 70 km/h
- Embankment width – 30.5-38.5 m
- Construction period – 22 months
Stage 4 – Reconstruction of motorway along Hero Shnitnikova in Avtozavoskiy Region, Nizhniy Novgorod
- Type of construction – reconstruction
- Road category – Main Street of regulated traffic
- Construction length – 1.207 km
- Designated speed – 70 km/h
- Lanes quantity – 4 pcs
- Pedestrian lane width – 2.0 m
- Construction period – 5 months
- Stage 5 – Turnpike
- "Free flow" type barrier-free toll collection system