CLIENT 
  GAFS 
  CONTRACTOR 
  Trust Kuprikkurilish
 
  DESIGN STAGE 
  2017 
  CONSTRUCTION STAGE 
  2019 
  TECHNICAL FEATURES 
 - bridge schema: 15.7+28.6×2+15.7m
- approaches: 2х(10.2+12.8х2+10.2+14.4+13.3+16) m
- total bridge length – 90.6 m
- length of each approach – 89.7 m
- pylon height – 31.1 m
 SCOPE OF WORK 
 - basic structures design
- design of technological structures
 SIMILAR OBJECTS 
  CABLE-STAYED FOOTBRIDGE IN TASHKENT NAVRUZ PARK, UZBEKISTAN
 
  First cable suspension bridge for pedestrians in Uzbekistan is located above the Anhor Channel within Navruz recreation park zone on the border of Unosabadsky and Shaihantahursky districts of Tashkent City.