CLIENT
State Company Lenavtodor
CONTRACTOR
OOO ETC
DESIGN STAGE
2020 – 2021
CONSTRUCTION STAGE
2021 – 2023
TECHNICAL FEATURES
- Bridge schema – 4х63+120+150+120+3х24 m;
- Total bridge length – 720 m;
- Bridge dimensions G-8.5+2х0.75;
- Lanes quantity – 2 pcs;
- Road width – 2х3.75;
- Technological approaches 0.75 m;
SPAN TYPES
- On the floodway of the left-bank the structure per spans 1-5 is fulfilled in the form of a continuous composite reinforced concrete pair of girders being linked via cross section ties via the 4x63 schema.
- On the central part of the bridge crossing, the structure N 5-8 is made via the form of a continuous three-span truss with a lower ride with a polygonal upper girth according to designated schema 120+150+120.
- On the right-bank floodway spans 8-11 are prefabricated girders of 24 meters long, being linked by means of longitudinal and transversal monolithic sections. U-shaped intermediate piers are fulfilled out of RC. Bridge abutments are reinforced concrete monolithic ones. Piles on Piers1-8 are bored ones with a diameter of 1.2 m with widening up to 2.3 m and on Piers 9-11 are drive prismatic piles.
SCOPE OF WORK
Work Documentation Stage
BRIDGE CROSSING OVER THE SVIR RIVER, PODPOROZHYE
The Pobedy Bridge over the Svir River in Podporozhye is the main road project of the Eastern part of Leningrad Region. This is new section of the Kola Highway towards Lodeynoye Pole — Podporozhye — Tokari — Pai — Petrozavodsk.