CLIENT
Federal Enterprise Аvtodor

GENERAL CONTRACTOR
Federal Enterprise Avtodor
DESIGN STAGE
2020 – 2022 
CONSTRUCTION STAGE
2021 – 2024 
TECHNICAL FEATURES
  • bridge schema: (84+4х126+84)+(4x63) m
  • total length: 930.5  m
  • carriageway schema: 2(G-10.5)
  • sidewalks and technical approaches - none
  • lanes quantity: 4 pcs
  • navigation clearance: 9.5х60 m
SCOPE OF WORK
Project Documentation Stage:
  • bridge design development
  • construction traffic management 
  • engineering network arrangement
  • exterior illumination design, power supply, drainage schema, navigation alarm, transportation safety measures
  • site auxiliary structures plan
  • Method Statement preparation
  • environment safety measures
  • fire safety development
  • construction stage monitoring 
  • monitoring design while service stage period
  • estimate documentation development
BRIDGE OVER THE SURA RIVER
Our new bridge crossing is a part of the M-12 Highway ‘Moscow – Nizhny Novgorod – Kazan’, Stage 6  454 - km 586, Nizhny Novgorod Region, Chuvash Republic (intersection with local road 22K-0162 ‘Rabotki – Poretskoe’ up to the next A-151 Highway ‘Tsivilsk – Ulyanovsk’ ( Stage 1.3 502 –  517 km).

SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
TUCHKOV BRIDGE IN SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE, SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE, SAINT PETERSBURG
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
Logo
Dynamic Heading