CLIENT
Federal Enterprise Аvtodor

GENERAL CONTRACTOR
Federal Enterprise Avtodor
DESIGN STAGE
2020 – 2022 
CONSTRUCTION STAGE
2021 – 2024 
TECHNICAL FEATURES
  • bridge schema: (84+4х126+84)+(4x63) m
  • total length: 930.5  m
  • carriageway schema: 2(G-10.5)
  • sidewalks and technical approaches - none
  • lanes quantity: 4 pcs
  • navigation clearance: 9.5х60 m
SCOPE OF WORK
Project Documentation Stage:
  • bridge design development
  • construction traffic management 
  • engineering network arrangement
  • exterior illumination design, power supply, drainage schema, navigation alarm, transportation safety measures
  • site auxiliary structures plan
  • Method Statement preparation
  • environment safety measures
  • fire safety development
  • construction stage monitoring 
  • monitoring design while service stage period
  • estimate documentation development
BRIDGE OVER THE SURA RIVER
Our new bridge crossing is a part of the M-12 Highway ‘Moscow – Nizhny Novgorod – Kazan’, Stage 6  454 - km 586, Nizhny Novgorod Region, Chuvash Republic (intersection with local road 22K-0162 ‘Rabotki – Poretskoe’ up to the next A-151 Highway ‘Tsivilsk – Ulyanovsk’ ( Stage 1.3 502 –  517 km).