CLIENT
Federal Enterprise Аvtodor
GENERAL CONTRACTOR
Federal Enterprise Avtodor
DESIGN STAGE
2020 – 2022
CONSTRUCTION STAGE
2021 – 2024
TECHNICAL FEATURES
- bridge schema: (84+4х126+84)+(4x63) m
- total length: 930.5 m
- carriageway schema: 2(G-10.5)
- sidewalks and technical approaches - none
- lanes quantity: 4 pcs
- navigation clearance: 9.5х60 m
SCOPE OF WORK
Project Documentation Stage:
- bridge design development
- construction traffic management
- engineering network arrangement
- exterior illumination design, power supply, drainage schema, navigation alarm, transportation safety measures
- site auxiliary structures plan
- Method Statement preparation
- environment safety measures
- fire safety development
- construction stage monitoring
- monitoring design while service stage period
- estimate documentation development
BRIDGE OVER THE SURA RIVER
Our new bridge crossing is a part of the M-12 Highway ‘Moscow – Nizhny Novgorod – Kazan’, Stage 6 454 - km 586, Nizhny Novgorod Region, Chuvash Republic (intersection with local road 22K-0162 ‘Rabotki – Poretskoe’ up to the next A-151 Highway ‘Tsivilsk – Ulyanovsk’ ( Stage 1.3 502 – 517 km).