Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
LLC BSK Vostok 
DESIGN STAGE
2005 — 2006
CONSTRUCTION STAGE
2007 — 2008
TECHNICAL FEATURES
  • bridge diagram: 63,3x3 m
  • bridge length - 200.55 m
  • width of traffic lane carriageway - 3.75 m
  • number of lanes - 2
  • design loads - A11, НК-80
  • road category - II
SCOPE OF WORK
  • general design
  • development of engineering project of replacement of bridge superstructures and bearings
  • development of working documentation of reconstruction
  • development of SAC&D
  • development of Method Statement
  • field supervision
SIMILAR OBJECTS
BRIDGE CROSSING OVER THE SVIR RIVER, PODPOROZHYE
BRIDGE OVER THE SUDA RIVER IN THE CHEREPOVETS DISTRICT OF THE VOLOGDA REGION
Reconstruction of the bridge crossing over the Suda River on the Vologda - Novaya Ladoga highway 148+300 km in the Cherepovets District of the Vologda Region. Reconstruction of the bridge with broadening of the limiting dimension to Г-10+2x1.5 m, with replacement of the carriageway precast concrete slabs with the monolithic one with arrangement of strengthening of the superstructure, with rearrangement of the piers. Girder bridge with continuous superstructure.
Logo
Dynamic Heading