CLIENTS
Federal Enterprise of Moscow
"Road and Bridge Construction Administration"
"Road and Bridge Construction Administration"
GENERAL DESIGNER
SC "Моsinzhproekt"
GENERAL CONTRACTOR
SC "МISК"
DESIGN STAGE
2021
CONSTRUCTION STAGE
2024
TECHNICAL FEATURES
- carriageway width - 13.25 m
- three lanes per 3.75 m
- two emergency lanes per 1 m
- minimum tunnel clearance - 5.25 m
- total length - 102.47 m
- underground part – 65.3 m
- urban portal – 26.61 m
- suburban portal – 10.56 m
- the entire tunnel is a solid structure
- service spaces are the part of the tunnel structure
SCOPE OF WORK
- area planning design
- engineering survey
- stage DD
- stage WD
- technical supervision
SIMILAR OBJECTS
TUNNEL AT THE INTERSECTION OF THE SOUTH-EASTERN CHORD WITH MOSCOW RING ROAD
This tunnel should link the regional and urban parts of the being designed Southeastern Chord. Section of the road, being designed for the tunnel is the II Class urban highway. Underground part of the tunnel will be located under the embankment of the MKAD and should pass in close proximity to the existing railway tracks of the Kursk direction as well as the overpass on the MKAD.