CLIENT
Moscow State Enterprise of Road and Bridge Administration
GENERAL CONTRACTOR
АO MISK
GENERAL DESIGNER
АО Моsinengprojekt
DESIGN STAGE
2021
CONSTRUCTION STAGE
2024
TECHNICAL FEATURES
- total length of roadway network is above 10 km
- three transportation interchange within MKAD on Simferopolskoey and Varshvskoe Shosse, two motorway tunnels, three viaducts over the railroad of the Bitza River as well as two underground pedestrian crossings with pair of regular ones.
SCOPE OF WORK
- design development
- set of engineering survey
Project documentation Stage:
- participation in design State Expertise
Working documentation Stage:
- Technical supervision.
SIMILAR OBJECTS
SOUTH-EASTERN CHORD
Construction of a road network with artificial structures and reconstruction of engineering communication within Moscow Ring Road MKAD up to Motorway Solntsevo-Butovo-Varshavskoye Shosse.