CLIENT
SC WHSD
GENERAL CONTRACTOR
SC АBZ-Dorstroy
SC Vozrozhdenie
SC Vozrozhdenie
GENERAL DESIGNER
SC АBZ-Dorstroy
SC Vozrozhdenie
SC Vozrozhdenie
DESIGN STAGE
2021 - 2024
CONSTRUCTION STAGE
2021 - 2025
TECHNICAL FEATURES
- city motorway
- designated speed– 80 km/h;
- lanes quantity – 4 (2 per each direction);
- roadway schema – 4+3.5+3.5+4 (rightmost lane is being designated for public transport);
- width of sidewalk –3.0 m.
Junction exits:
- left-turn exits: 40 km/h;
- right-turn exits: 60 km/h;
- exits С1-С6; section of the exit С7 from Skippers Channel to the exit С6 – 1 pcs;
- exit С7 from С6 up to WHSD - 2 pcs.
Lane width:
- left-turn exits – 5.5 m;
- right-turn exits – 5.0 m;
- two-lane section 2x3.75 m.
Emergency lanes:
- right lane - 2 m;
- left lane - 1 m;
- technical approaches (in case of noise barriers ) - 0.75 m;
- type of pavement and type of coating - capital, asphalt concrete.
SCOPE OF WORK
- WD design;
- estimation documentation design;
- WD correction and Federal Expertise;
- technical supervision.
SIMILAR OBJECTS
WHSD TRANSPORTATION INTERCHANGE WITHIN SKIPPER CHANNEL ST. PETERSBURG, RF
Construction of our new transportation junction is being conducted at the intersection of the
main course of the highway Western High Speed Diameter, regarding Stages the IV and V of the
Central Section, with the projected continuation of the Skippers Channel street of Vasilyevsky
Island.
OUR PROJECT PROVIDES
Within the section from Nalichnaya Street to the left side of the Skippers Channel reconstruction of the Skippers Channel Street is being envisaged.
Scope of work:
main course of the highway Western High Speed Diameter, regarding Stages the IV and V of the
Central Section, with the projected continuation of the Skippers Channel street of Vasilyevsky
Island.
OUR PROJECT PROVIDES
- exits construction of the transportation interchange of Skipper Channel with WHSD, including the junctions to the previously built high-speed transitional lanes adjacent to the section of the main course of highway;
- construction of transitional high-speed lanes for exits adjacent to the overpass of WHSD;
- extension construction of the Skippers Channel in a new position from Nalichnaya Street to the alluvial areas;
- start of the work PK 1+75.15 (right direction) plus PK 1+74.43 (left direction) – from Skippers Channel to the alluvial areas;
- work completion – junction to Nalichnaya Street PK 20+13.81 (left direction) with PK 3+41.97(right direction).
Within the section from Nalichnaya Street to the left side of the Skippers Channel reconstruction of the Skippers Channel Street is being envisaged.
Scope of work:
- separation of the right and left directions adjacent to Nalichnaya Street;
- street tracing in new location;
- sidewalks construction of 3.0 ml.