CLIENT
Moscow Federal Enterprise
“Department of Road & Bridge Construction”
“Department of Road & Bridge Construction”
GENERAL DESIGNER
SC “МISК”
DESIGN STAGE
2021-2022
CONSTRUCTION STAGE
2024
SCOPE OF WORK
- design of territory;
- engineering survey;
- stage of DD fulfillment;
- expertise supervision;
- stage of WD fulfillment
- technical supervision.
TECHNICAL FEATURES
- total length of Southeastern Chord - 128.08 m, including:
- closed section – 81.05 m
- ramp section – 22.564 m
- carriageway width – 13.25 m per each direction
- lanes quantity – 3 pcs per each direction
- total lane width – 35.82 m
- site area – 4,587.8 m2
- footing width:
- left one – 0.65 m
- minimum clearance per height – 5.25 m
- maximum depth of the tunnel – 8.5 m
- maximum laying depth – 1.2 m
- elevation markings:
- min per pile toe – 139.165 m
- max per portal – 178.36 m