Moscow Federal Enterprise
“Department of Road & Bridge Construction”
GENERAL DESIGNER
SC “МISК”
DESIGN STAGE
2021-2022
CONSTRUCTION STAGE
2024
SCOPE OF WORK
  • design of territory;
  • engineering survey;
  • stage of DD fulfillment;
  • expertise supervision;
  • stage of WD fulfillment
  • technical supervision.
TECHNICAL FEATURES
  • total length of Southeastern Chord - 128.08 m, including:
      - ramp section – 24.467 m
      - closed section – 81.05 m
      - ramp section – 22.564 m
  • carriageway width – 13.25 m per each direction
  • lanes quantity – 3 pcs per each direction
  • total lane width – 35.82 m
  • site area – 4,587.8 m2
  • footing width:
      - right one– 1.2 m
      - left one – 0.65 m
  • minimum clearance per height – 5.25 m
  • maximum depth of the tunnel – 8.5 m
  • maximum laying depth – 1.2 m
  • elevation markings:
      - min – 166.786 m
      - min per pile toe – 139.165 m
      - max per portal – 178.36 m
SIMILAR OBJECTS
LEFORTOVSKIY TUNNEL AS A PART OF MOSCOW RING ROAD, RUSSIA
TUNNEL UNDER THE SIMFEROPOL HIGHWAY, NEAR MKAD TO THE SOLNTSEVO − BUTOVO − VARSHAVSKOE SHOSSE, SOUTHEASTERN CHORD, MOSCOW
Tunnel under Simferopol highway, on the section from MKAD to the Solntsevo - Butovo - Varshavskoe highway, South-Eastern Highway, Moscow
Logo
Dynamic Heading