CLIENT
Moscow Federal Entity Bridge and Road Administration
GENERAL CONTRACTOR
SC Mosingproekt
DESIGN STAGE
2018 – 2019
CONSTRUCTION STAGE
2018 – 2019
Opening of the bridge
Opening of the bridge
TECHNICAL FEATURES
- bridge schema: 45.0 + 49.2 + 99.2 + 150 + 99.2 + 24.2 + 31.93 + 24.7
- total bridge length — 530.37 m
- middle span length— 150 m
- width — 36.9
- lane width— 2х3
- bridge clearance — 10.2 m
SCOPE OF WORK
- design documentation correction
- development of design documentation
SIMILAR OBJECTS
BRIDGE ON SIMONOVSKAYA EMBANKMENT, MOSCOW
Bridge is located on Simonovskaya Embankment near river-boat station up to 2-nd cross-street. Bridge over Koschuhovski back water linked two districts: South with South-East one.
Period of construction considered as two years, but it was completed in seven months instead with the same methods which were implemented during Crimean Bridge construction.
Period of construction considered as two years, but it was completed in seven months instead with the same methods which were implemented during Crimean Bridge construction.