CLIENT
Cherepovetskiy Metallurgical Plant
GENERAL CONTRACTOR
Mostootryad 61
JSC Mostostroy 6
JSC Mostostroy 6
DESIGN STAGE
1972 — 1976
CONSTRUCTION STAGE
1976 — 1979
TECHNICAL FEATURES
- bridge diagram:53.0 + 194.25 + 136.5+ 68.65 + 4 х 68.25 + 52.5 m;
- total length of bridge structure – 709.25 m;
- A – shaped pylon;
- pylon height – 83.5 m;
- weight of stay cables – 510 t;
- length of stay cables – 16 km;
- clearance – 28.4 m.
SCOPE OF WORK
- design of SAC&D;
- design of work technology;
- development of Method Statements (MS);
- field supervision.
OKTYABRSKIY CABLE-STAYED BRIDGE OVER THE SHEKSNA RIVER, CHEREPOVETS
City Bridge is being connected Industrial and Zasherninskiy districts of Cherepovets city. It is the first ever built cablestayed Bridge in Russian Federation. Bridge deck structure presented by steel girder structure with cable-stayed system, with five fan type RC approaches. Single A-shaped steel pylon with six pairs of stay cables, located on Pier 2 between spans of 194.2 m and 136.5 m.