Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Department of Capital Construction and Repair of Cherepovets City Administration
DESIGN STAGE
2010 — 2011
CONSTRUCTION STAGE
2022
SCOPE OF WORK
  • bridge crossing design length – 2,000 m
  • total length – 1,166.85 m
  • schema: 4х63 + 63 + 64 + 98 + 220 + 98 + 64 + 63 + 3х63 + 42 m
  • height of RC pylons – 91 m
  • reinforced concrete pylons
  • stays length – 5,428 m
  • weight of stays – 325 t
  • composite reinforced concrete superstructures
  • number of lanes – 6
  • carriageway overall dimension – 2(Г-14.25)
  • sidewalks – 2х3.0 m
  • underclearance – 180 m
  • height of underbridge clearance within a main span – 17 m
TECHNICAL FEATURES
  • general design
  • design of basic structures (bridge and approach flyovers)
  • integrated design
  • development of architectural solutions
  • design of SAС&D and Construction Method Statement
  • road design
  • illumination design
  • navigation signaling design
  • design of aviation signaling
  • landscaping design
  • technical supervision
CABLE-STAYED BRIDGE OVER THE SHEKSNA RIVER, CHEREPOVETS
Two H-type pylon Cable-Stayed Bridge Crossing is being connected Zarechenskiy and Zashekninskiy districts on Arkhangelskaya street in Cherepovets City.
SIMILAR OBJECTS
CABLE-STAYED OVERPASS ON CHERNYAHOVSKOGO STREET IN SAINT PETERSBURG
OKTYABRSKIY CABLE-STAYED BRIDGE OVER THE SHEKSNA RIVER, CHEREPOVETS
CABLE STAYED BRIDGE OVER THE DAUGAVA RIVER IN JEKABPILS CITY, LATVIA
Logo
Dynamic Heading