CLIENT
Sevkavuprdor
GENERAL CONTRACTOR
Rostovavtomost
DESIGN STAGE
1999
CONSTRUCTION STAGE
2002
TECHNICAL FEATURES
- continuous composite reinforced concrete superstructure with a roadway above
- bridge diagram - 55.0+3x88.0+55.0 m
- bridge length - 387 m
- clear headway of bridge Г-11.5, with a sidewalk of the width of 1.5 m on one side and an operating aisle of the width of 0.75 m on the other side
- total weight of steel – 1 500 tonnes
- total weight of reinforced concrete - 5000 m³
- bridge piers are of 20 m in high of cast-in-place and precast construction
SCOPE OF WORK
- development of SAC&D
- development of Method Statement for construction of piers and launching of bridge
SIMILAR OBJECTS
MOTORWAY BRIDGE CROSSING OVER SEVERSKY DONETS IN THE TOWN OF KAMENSK-SHAKHTINSKY
Motorway bridge crossing over Seversky Donets in the town of Kamensk - Shakhtinsky of Rostov Region, which provides a double-lane vehicular traffic towards Rostov-on-Don – Moscow. At the first stage of reconstruction, the existing bridge with a limiting dimension Г-8, located 20 m from the new bridge axis, was preserved for reverse direction of movement. The existing bridge was built in 1966 and was thoroughly repaired in 1999, and this provided the possibility of its use at the first stage of reconstruction of the bridge.