Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Road Administration of UFA city
DESIGN STAGE
2015
CONSTRUCTION STAGE
N/A
TECHNICAL FEATURES
  • bridge schema — 1 х 67.5m;
  • bridge length — 112.80m;
  • carriageway schema — 1.0 + 4.0 + 3.5 + 3.5 + 4.0 + 1.0m;
  • deck steelweight — 6t;
  • RC slab — 435.8m³;
  • RC volume — 4,256.6m³.
SCOPE OF WORK
  • general design;
  • architectural solutions development;
  • main structures design;
  • method statement development;
  • SAC&D design.
SIMILAR OBJECTS
FLYOVER IN SESTRORETSK TOWN
VIADUCT OVER THE SALAVAT YULAEV AVENUE, UFA CITY
The viaduct through the Salavat Yulaev Avenue was being designed in the alignment of Kommunisticheskaya Street within the Kirovsky District of Ufa City, Republic of Bashkortostan.
Logo
Dynamic Heading