CLIENT
Federal Enterprise Head Department of Motorways
DESIGN STAGE
2019 – 2020
CONSTRUCTION STAGE
2021 – 2024
TECHNICAL FEATURES
- designated speed – 120 km/h
- bridge schema - 2(Г-11.5+2х0.75)
- turnpikes - 3 pcs.
SCOPE OF WORK
- general design
- engineering survey
- DD development
SIMILAR OBJECTS
MOTORWAY Р-152 SHOPSHA-IVANOVO-NIZHNY NOVGOROD, NIZHNYGORODSKAYA OBLAST
New site is located within Nizhnygorodskaya Oblast, Balohninski District, detour of Balahni and Zavolzhy cities. Our road should pass over the Hydrograph Settlement, Istomino Village with link to Galkiono Highway.
Site is composed of:
Site is composed of:
- total length of the motorway 24.616 km;
- flyover on transportation interchange N1 (initial point);
- flyover on PК 89+96.30;
- flyover on PК 119+10,12 (Hydrograph Gardens);
- viaduct over the Tioplaya River;
- viaduct over the Tretyakovka River;
- flyover within transportation interchange N3 PК 185+18.38;
- bridge over the Chernaya River.