CLIENTS
  • OOO ‘Central Complex Design’
  • Municipal Administration, Gusev Town
GENERAL CONTRACTOR
  • Design: ООО ‘Central Complex Design’
  • Construction: ООО ‘MostDetal’
DESIGN STAGE
2016
CONSTRUCTION STAGE
2016 – 2017
TECHNICAL FEATURES
  • piers of solid RC on piled foundation
  • foundation of prism piles of 35×35 cm cross-section
  • pier body of composite RC
  • per each approach side RC retaining wall should be installed
  • span should be formed as a girder arch structure
  • total span length 31.6 m
  • cross-section to be composed of four H-girders per distance of 36m
  • girder height per middle span is being considered from 0.89 m up to 0.7m
SCOPE OF WORK
  • initial paperwork design
  • technical supervision
SIMILAR OBJECTS
CABLE-STAYED FOOTBRIDGE IN TASHKENT NAVRUZ PARK, UZBEKISTAN
PEDESTRIAN CROSSING OVER THE PISSA RIVER, KALININGRAD REGION
Being designed pedestrian crossing is situated in Gusev Town