Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
«Trest Lenmostostroy» Ltd
Board of Transportation Directory
GENERAL CONTRACTOR
«Trest Lenmostostroy» Ltd
DESIGN STAGE
2006 — 2007
CONSTRUCTION STAGE
2007 — 2009
STRUCTURES WITHIN MOTORWAY
Two motorway flyovers
Highway МР3
  • carriageway – asphalt-concrete
  • schema 25.5+(9.5)-29+(10.55)m
  • roadbed 41.5-45m

Tram viaduct
Pedestrian tunnel near Kurakina Street
  • total length 62 m
  • composite structure
SCOPE OF WORK
«Design Documentation» Stage
  • main structures design
  • architectural solution development
  • construction MS development
  • tender documentation completion
  • Federal Expertise passing

«Work Documentation» Stage
  • general design
  • total main structures design
  • SAC&D development
  • MS design
  • technical supervision
SIMILAR OBJECTS
VIADUCT OVER THE SALAVAT YULAEV AVENUE, UFA CITY
FLYOVER WITHIN PISKAREVSKIY PROSPECT OVER THE RAILROAD BY PISKAREVSKA STATION
Piskarevskiy Prospect Viaduct reconstruction over the Piskarevska Railroad Station including two motorways and one train track with pedestrian tunnel. Total length 1.09 km on the Piskarevskiy Prospect plus 0.8km from Ekaterininskiy Prospect toward Brusova Street.
Logo
Dynamic Heading