CLIENT 
  JSC WHSD 
  CONTRACTOR 
  ICA Astaldi Ictas
 
  OWNER 
  Northern Capital Highways, Ltd
 
  DESIGN STAGE 
  2013 — 2014
 
  CONSTRUCTION STAGE 
  2016 
  TECHNICAL FEATURES 
 - Bridge schema: 60+110+240+110+60 m;
 - Total length – 580 m;
 - Carriageway clearance 2 х (Г – 17.5);
 - RC pylons;
 - Pylon heights – 124 m.
 
 SCOPE OF WORK 
 - Architectural conception design;
 - Main structures design;
 - Working Documentation per Cable Stayed Bridge;
 - SAC&D per the bridge structure;
 - MS development and issue;
 - Technical Supervision.
 
 CABLE STAYED BRIDGE OVER THE PETROVSKY CHANNEL, SAINT PETERSBURG 
  The Bridge Crossing was conceived as a part of the important city Motorway Western High Speed Diameter. The structure is located on convex curve of 10,000 m. Projection of upstream clearance is 166х25 m and downstream clearance is 80х25 m. Foundations of piers were fulfilled as bored piles Ø1,500 mm. Deck cross-section is presented as a structure of four main girders of 1.76 m height within stay cable system. Abutments composed of six box type main girders of 1.76 m height. Bridge girders were connected via beams on distance of 65 m. (3 m per edge piers). Composite monolithic carriageway slab thickness is 220 mm. SSI2000 was an option of stay cable system with galvanized strands individually greased and coated with a high-density polyethylene sheath. The strands are used in accordance with the EN10138 standard. Total strands are seven wire 15.7mm diameter. Designated distance within stays is 13m.
 