Logo
  • О КОМПАНИИ
    • СПЕЦИАЛИЗАЦИЯ КОМПАНИИ
    • НАША КОМАНДА
    • СЕРТИФИКАТЫ
    • ДЕЛОВАЯ РЕПУТАЦИЯ
  • ПРОЕКТЫ
  • МЕДИА
    • НОВОСТИ
    • ПРЕССА О НАС
    • БРОШЮРЫ О КОМПАНИИ
    • НАУЧНЫЕ СТАТЬИ
  • КОНТАКТЫ
BRIDGE FEATURES AFTER RECONSTRUCTION
  • total length of the bridge structure — 255.05 m
  • bridge schema: 38.63+47.12 + 9.2 + 58.6 + 9.2 + 47.12+38.63m;
  • carriageway clearance  – 22 m;
  • bridge width– 27.6 m;
  • lanes quantity — 6 pcs.
SCOPE OF WORK
  • main structures reinforcement;
  • piers reconstruction with the entire equipment alteration of the bascule bridge system;
  • restoration of the railing, lighting poles plus granite cladding;
  • engineering network rearrangement;
  • external decorative illumination  reconstruction of the bridge;
  • bascule bridge service room renovation.
SIMILAR OBJECTS
FLYOVER TO PISKAREVSKIY PROSPECT FROM RUSTAVELY STREET TO MOTORWAY «KAD», SAINT PETERSBURG
DVORTSOVY BRIDGE
Dvortsovy Bridge was designed as an essential link to Vasileostrovsky and Admiralteysky Districts of our metropolis. Nowadays it is an integral part of St. Petersburg highway system. During the reconstruction of that aged bridge, the existing dimensions of the navigable spans were preserved.
Logo
Dynamic Heading