DESIGN STAGE
2013
SCOPE OF WORK
Stage "Project documentation":
- design
- engineering and hydrological surveys
SIMILAR OBJECTS
RECONSTRUCTION OF THE EMBANKMENT OF THE VOLKHOV RIVER IN VELIKY NOVGOROD
The embankment complex includes reconstruction of the existing uncompleted embankment with construction of a vertical wall witha reverse filter and boat ramps.
The provision is made for construction of a floating jetty for small vessels and facilities for ship launching.
Viewing areas, cafes, stylized ship, stairs and facilities for movement of people with limited mobility are located on the embankment.
The driveway is designed on the upper esplanade level.
The provision is made for construction of a floating jetty for small vessels and facilities for ship launching.
Viewing areas, cafes, stylized ship, stairs and facilities for movement of people with limited mobility are located on the embankment.
The driveway is designed on the upper esplanade level.