CLIENT
SC Аvtoban
DESIGN STAGE
2016 – 2017
CONSTRUCTION STAGE
2016 – 2020
TECHNICAL FEATURES
- type of construction – New one
- Road Class – IА
- designated speed – 140 km/h
- lane’s quantity 2x2 pcs.
- lane width – 3.75 m
- width of technical approach– 1.0 m
- carriageway width – 2(G-11)
- width of divisor (including emergency lanes) – 4.1m
- bridge width – 27.3m
- Bridge schema: 41.75+41.95+87.05+150.0+87.05+61.95+4х65.0+8х63.0+3х42.0+41.19
- type of road pavement – capital
- type of cover – asphalt-concrete
- temporary vertical loads – А14, Н14
- bridge length – 1,410.15 m
- bridge area – 38,497 m2
SCOPE OF WORK
- work documentation analysis and optimization
- design documentation development per stages ‘Technical and structural features of linear construction site’
- main structures development
- construction arrangement project
- SAC&D development
Stage ‘Work documentation’:
- construction technology development
SIMILAR OBJECTS
BRIDGE OVER THE MOSCOW CHANNEL
Bridge and further motorway over the Moscow Channel with viaducts structures of PK 258+58,93 is being crossing the following:
- Motorway А-104 Moscow - Dimitrov-Dubna (Dmitrovski Highway), with four lanes within spot of intersection (without divisor), width of carriageway is 14 m, sub grade width is 15m
- Two rail tracks of Sevelovskiy Direction of Moscow Rail Roads between Iksha Station and Morozki Station with further arrangement of double additional ways per one in each direction
- Moscow Channel: area between Yachromski and Ikshinski impoundments, within Sluice 4 and Sluice 5 (530 m from Sluice 5 entrance). Artificial fairway within spot of intersection has width of 112 m and depth of 4.5 m with bridge clearance of 17.0 m. Approaches of three meters width should be completed along that channel embankments.
- 12 meters is maximum width of Iksha River.