CLIENT
OOO "StroyAllians"
GENERAL CONTRACTOR
OOO "StroyAllians"
DESIGN STAGE
June-July 2016
CONSTRUCTION STAGE
April-July 2017
TECHNICAL FEATURES
  • flyover schema  57.00+81.00+48.00m
  • cross-section of the structure is H-shaped beam with a height of 3,200mm
  • main girders with orthotropic plates were connected via bolting and welding joints
  • main structures were completed via steel of Russian Grade 10ХСНД plus RC piers.
SCOPE OF WORK
MS design
SIMILAR OBJECTS
TRAFFIC INTERCHANGE IN NOVOSIBIRSK CITY, RUSSIA
VIADUCT OVER THE RR ON 19KM OF MMK – PAVLOVSKAYA SLOBODA - NAKHABINO MOTORWAY
Viaduct was conceived as a curved continuous solid deck structure with longitudinal inclination of 0.02° and radius 2,500m.