CLIENT
Department of Roads and Bridges Construction, Moscow
DESIGN STAGE
2019 — 2020
CONSTRUCTION STAGE
2020 — 2022
TRANSPORT JUNCTION INCLUDES
- 2 side roads along МKAD;
- 10 exits;
- 4 viaducts;
- 1 pedestrian crossing.
TECHNICAL FEATURES
SIDE ROAD P1
SIDE ROAD P2
ARCHWAY PEDESTRIAN CROSSING
Located within Ostashkovskaya Street #30.
- one way , two way and three way road of – 1,021. 8 m,
- flyover – 119.5 m;
- material - RC ;
- road schema 30.0+48.0+30.0 m;
- total width – 15.41 m;
- carriageway width – 13.25 m.
SIDE ROAD P2
- one way , two way and three way road of – 641,05 m,
- flyover – 119.4 m;
- material - RC;
- road schema 30.0+48.0+30.0 m;
- total width – 15.41 m;
- carriageway width – 13.25 m.
ARCHWAY PEDESTRIAN CROSSING
Located within Ostashkovskaya Street #30.
- the arch has U-shape;
- total length – 36.0 m;
- material - RC;
- total width – 3.0 m;
- staircase width – 3.35 m;
- glazing – solid polycarbonate.
SCOPE OF WORK
- Stage: DD, WD
- General Design.
SIMILAR OBJECTS
TRANSPORTATION INTERCHANGE MKAD ON THE INTERSECTION OF OSTASHKOVSKOE SHOSSE
Transportation interchange is located within North-East area of Severo-Medvedkovo District of Moscow about 90-91 km from MKAD.
Type of works: new construction and reconstruction.
The Project includes reconstruction of Ostashkovskoe Shosse Transportation Interchange and MKAD with exits and pedestrian crossings.
The following measures should be completed:
Type of works: new construction and reconstruction.
The Project includes reconstruction of Ostashkovskoe Shosse Transportation Interchange and MKAD with exits and pedestrian crossings.
The following measures should be completed:
- MKAD transportation flow separation together with exits flows from adjacent roadways;
- Spots of left turn transportation flows intersections elimination within cloverleaf types transport junctions;
- Arrangement of two extra left turn exits.