CLIENT
Federal Enterprise ‘Road Administration of Permski Kray’
DESIGN STAGE
2019 — 2020
CONSTRUCTION STAGE
2024 — 2028
TECHNICAL FEATURES
- road class: III;
- the entire road length – 55.659 km;
- class of road pavement – Capital;
- material – asphalt-concrete;
- designated load:
- per artificial structures- А-14, Н-14.
SCOPE OF WORK
Stage: DD
- General Design;
- road pavement development;
- main structures design;
- MS design;
- SAC&D design;
- estimation development;
- Federal Expert evaluation.
SIMILAR OBJECTS
MOTORWAY KUNYA –GUBAHA, PERMSKI KRAY
New motorway should be constructed within Dobrianski and Gubanski Districts of Permski Kray to link the old Kungur-Solikamsk Road on 192+000 km with Perm-Berizniki Highway on 93+276 km, which should be more comfortable for motorists via short-cut of about 60 km. New road should be divided by 6 stages of construction. The road started South-West of intersection ‘Kunya-Tabori’ and ‘Perm-Berezniki’ Highways. The end of the road is located on 185+307 km of the old Kungur-Solikamsk Road with North-East general direction.
Being designed road includes:
Being designed road includes:
- civil structures of transport infrastructure;
- roadbed, bridges and flyovers;
- transportation interchanges.