CLIENT
Federal Enterprise “Russian Highways"
GENERAL CONTRACTOR
SC “Avtodor Ltd”
DESIGN STAGE
2022 - 2024
CONSTRUCTION STAGE
2023 - 2024
STRUCTURES AS A PART OF THE ROUTE
- viaducts – 17 pcs
- bridges – 9 pcs
- eco ducts – 4 pcs
within the above project - 28 pcs.
TECHNICAL FEATURES
- road type – IB
- designated speed - 120 km/h
- length per Stage 1.3.1 – 90.1 km
- lane width – 3.75 m
- lanes quantity - 4 pcs (two per each direction)
SCOPE OF WORK
- design and survey works
- geodetic surveys
- geological surveys
- hydro-meteorological surveys
- environmental survey
- DD design
- WD design
- technical supervision
SIMILAR OBJECTS
MOTORWAY "KAZAN - YEKATERINBURG"
The above section of the Durtyuli – Achit Highway in the Republic of Bashkortostan is one of three being designed stages of the Durtyuli – Achit speedy Federal Highway, which should be the part of a large-scale extension of the Highway M-12 Vostok up to Yekaterinburg. Total length of Stage 1.3.1, which located in the Dyurtyulinsky and Buraevsky City Districts concerning Northwestern part of the republic, should be 90.1 km.
The new highway ought to improve the traffic safety, relocate the traffic outside nearby settlements, reduce travel time plus have to ensure comfortable communication of the largest regional centers. In addition, new jobs will be created, the investment attractiveness of the regions in the zone of attraction of the highway will increase, and tourism development, we do hope, should boom as well.
For more details see: https://www.russianhighways.ru/press/news/102484/
The new highway ought to improve the traffic safety, relocate the traffic outside nearby settlements, reduce travel time plus have to ensure comfortable communication of the largest regional centers. In addition, new jobs will be created, the investment attractiveness of the regions in the zone of attraction of the highway will increase, and tourism development, we do hope, should boom as well.
For more details see: https://www.russianhighways.ru/press/news/102484/