CLIENT
SC Petersburg roads
FEDERAL CLIENT
State Company AVTODOR
DESIGN STAGE
2019 – 2020
CONSTRUCTION STAGE
2021 – 2023
TECHNICAL FEATURES
- Bridge schema: 61.0+3х88+61.0 m;
- bridge length from abutments edge: 397.62 m;
- clear headway of bridge: - 15.25 m;
- width of pedestrian lane upstream: 2.25 m;
- technical approach of downstream: 0.75 m;
- quantity of lanes: 3 pcs.;
- bridge clearance per main span: 12х80 m.
SCOPE OF WORK
- Project Documentation Stage:
- structures(right and left bridges);
- reconstruction of right bridge;
- list of measures for left bridge reconstruction;
- reconstruction of bridge approaches;
- technical order development for traffic arrangement;
- utility lines rearrangement;
- external lights, power supply, drainage, navigation lights, with transportation safety monitoring design;
- set of bridge linear structures design;
- construction method statement development;
- environment safety measures implementation;
- fire safety measures implementation;
- monitoring during construction stage;
- design development of right bridge maintenance while stage of service;
- estimate documentation development.
BRIDGE OVER THE SEVERNI DONETS RIVER, KAMENSK-SHACHTINSKI. ROSTOVSKAYA OBLAST. RECONSTRUCTION
Motorway road Don M-4 Moscow – Woronesch - Rostow-Na-Donu - Noworossijsk. Bridge reconstruction over the Severni Donets River on 930+788 km of M-4 ‘Don’ started from Moscow to Woronesch up to Rostow-Na-Donu, Rostovskaya Oblast.
The above truss bridge of 55.03+3×87.9+55.03 m was completed about 1960. Back in 2019 the damage of upper girth within span 4-5 was spotted by the company ‘SMU-Dordonstroy’. Further the bridge was closed for transportation and pedestrians.
The above truss bridge of 55.03+3×87.9+55.03 m was completed about 1960. Back in 2019 the damage of upper girth within span 4-5 was spotted by the company ‘SMU-Dordonstroy’. Further the bridge was closed for transportation and pedestrians.